Charger Oaks High School
A HIGH PROFILE FLOOR SYSTEM
Kategorier
Kvadratmeter
1000 m2
Contractor
Champion Hardwood
Land
USA
Plats
Covina, California
The Charger Oaks High School in California wanted to upgrade their old, gym floor and required a high profile floor system with leveling flexibility to accommodate an uneven subfloor.
Junckers 2-layer batten system DuoBat 120+ worked perfectly for this purpose. The system can be installed with a profile span of 120 – 242mm and levelling is easily done by using Junckers adjustable and locking wedge system, totally without use of nails and tools.
1000 m² of Junckers solid hardwood SylvaSport Beech Premium were installed in this gym.